Marine technology / Commercial decisions

The unit price is not
the mission cost.

A marine drone business case should explain what it takes to put the system to work, keep it available and use what it produces.

$ / mission

Start with a defined job. Then account for the system, the people and the assumptions behind the number.

The short version

Compare the same job over the same period. Make unknown costs and planned utilization visible.

define the job

Start with the work the buyer actually needs done.

A marine drone has a purchase price. A usable marine capability has a budget, a crew or operating team, a place in a workflow and a reason to be deployed again. I want the business case to describe that second thing. Otherwise, a spreadsheet can look impressively precise while leaving out most of the decision.

Start with one bounded job. For example, a hypothetical operator might need repeatable inspection records for a defined group of waterfront assets. The question is whether a proposed system can produce records that the organization can use, under the conditions in which it actually works. “Own an underwater vehicle” is a purchase description. It does not explain the result.

Write down the operating window, required output, expected frequency and responsible team. Then name the current alternative. That might be a contracted service, an existing remotely operated vehicle, a different inspection method or postponing the work. Those alternatives have different costs and limitations. They deserve an honest comparison rather than a convenient role as the expensive option in a sales presentation.

My surface and subsurface marine drone project story describes business and positioning work around a developing system. This article takes one commercial question further: how to make a cost argument understandable without confusing a projected unit price with the cost of putting the system to work.

cost boundary

The first useful number is the boundary around the estimate.

An acquisition estimate, a deployment budget and a life-cycle estimate answer different questions. Label the model before anyone relies on its total. A small acquisition estimate can be useful. Calling it a complete cost of ownership makes it misleading.

Three estimates, three different decisions
EstimateWhat belongs inside itWhat it helps decide
AcquisitionThe configured vehicles, required equipment, delivery and any included services.What must be purchased to obtain the specified package?
DeploymentThe people, equipment, preparation, travel, operating support and output handling for a defined job.What does it take to carry out this work?
Life-cycle planningAcquisition plus the applicable operating, support, renewal and end-of-service costs over a stated period.Can the organization sustain the capability?

The GAO Cost Estimating and Assessment Guide emphasizes a defined technical baseline, assumptions, data, uncertainty and updating estimates with actual costs. I find that discipline useful even when a business is building a modest internal worksheet. A total without its assumptions is difficult to examine and very easy to repeat.

configured system

A vehicle and a ready-to-use system can be different purchases.

A public example makes this distinction concrete. The BlueROV2 buyer’s guide separates the core kit from configuration choices and other equipment needed to operate it. Its guide covers tether and lighting options and identifies batteries, a charger, a computer and a controller among the required items. That is useful purchasing information. It lets a buyer see what the package contains and what still needs to be supplied.

I am using that documentation as an example of clear scope, not as a recommendation for a particular mission or a claim of a relationship with Blue Robotics. A small inspection system and a larger autonomous marine system can have very different operating requirements. The general business question survives those differences: what must be available before this particular configuration can produce its intended result?

Ask the supplier to distinguish included, optional, customer-supplied and still-undetermined items. Then identify the person who confirms each customer-supplied item. Existing equipment should not quietly become “free” if it needs an upgrade, consumes another team’s capacity or cannot support the proposed configuration.

recurring work

The recurring work is where the business case becomes real.

People do more than operate a vehicle during a deployment. Depending on the application, work can include preparation, transport, launch and recovery, checks, maintenance, charging, training and turning collected material into a deliverable. A model that counts only time in the water can understate the labor it needs.

Separate fixed annual commitments from costs that increase with use. A support agreement may be fixed for a period. Travel or expendable items may change by deployment. Some labor changes in steps: one trained team can handle a certain workload, after which the organization needs another person or a different schedule. A perfectly smooth cost curve is not always an honest picture of a working business.

Also define what happens when the system is unavailable. A replacement vehicle may address one failure mode. It may do little for a missing component, an unavailable operator or a blocked data workflow. Those possibilities belong in a discussion about readiness and continuity, not in an unsupported promise that a spare vehicle guarantees uptime.

For the manufacturer, this is also a sales lesson. A prospect asking about training or support is often examining whether the purchase will fit into ordinary work. Useful answers make the buying decision clearer. Hiding those questions behind a request for a quote creates avoidable uncertainty.

capacity

Count usable work, then examine the forecast.

A fleet of ten vehicles does not necessarily create ten times the useful output of one. The limiting resource might be a launch point, recovery equipment, qualified people, a communications arrangement, maintenance capacity or the team that reviews the data. For some systems, parallel work may be feasible. For others, the operating model needs to change before another vehicle helps.

This is why I prefer a documented workload forecast to an attractive utilization percentage on its own. What assignments create the demand? Who authorizes them? What seasonal or operating restrictions apply? Which activities can run together? The answer gives a capacity claim something to stand on.

Cost per planned deployment can be helpful, provided everyone can see that the denominator is planned. If the forecast is forty deployments and the actual count becomes twenty, the acquisition cost has not politely divided itself in half. Show a lower-use case as well as the expected case. Avoid calling either one guaranteed savings.

A business case should survive a smaller denominator.
planning worksheet

Build a first-pass cost worksheet.

This worksheet separates acquisition from recurring operating costs. It is a cash-planning sketch for a fleet over a stated horizon, not a formal life-cycle estimate or a return-on-investment calculation. Enter your own figures in U.S. dollars. Values are not supplied as market benchmarks.

Count an item once. If training is already in the package quote, do not add it again as an integration cost. The per-deployment labor input should cover the work you intend to count. Annual fixed costs should exclude those same hours. Use the unknowns field to keep missing costs visible.

Your assumptions, made visible.

Enter your assumptions, then calculate. Blank cost inputs will count as zero.

Select the output, then press Ctrl+C or Command+C to copy it. The calculations run in this page without submitting these inputs to PaperBoat. The tool does not store your entries. No discounting, tax, financing, depreciation, residual value, failure probability or changing annual costs are calculated. Add applicable exclusions to your own model. Zero-filled totals are not a completed budget.

The arithmetic is straightforward: acquisition equals vehicle quantity times vehicle price, plus fleet equipment and one-time integration. Annual operation equals fixed annual costs plus planned deployments times labor and other deployment costs. The horizon total adds acquisition to the stated number of years of operation. Cost per planned deployment divides that total by the planned deployment count across the horizon.

uncertainty

Keep a quoted figure separate from a hoped-for figure.

Label each important input as quoted, measured, estimated or projected. A dated supplier quote answers a different question from an anticipated production saving. An observed deployment duration has a different evidentiary basis from an engineer’s early estimate. Both can belong in the discussion if they are identified accurately.

Then test the assumptions most likely to change the decision. What happens if use is lower, support is more expensive or integration takes longer? If a modest change reverses the buying conclusion, that is a reason to investigate the assumption before calling the case settled. It is useful information for a prototype team as well as a purchasing team.

For a developing marine product, I would keep the current configuration, a planned production configuration and an expansion scenario separate. That allows ambition into the conversation without lending future performance the credibility of a present-day result.

commercial story

Give the buyer a cost explanation they can carry into the next meeting.

A manufacturer should be able to describe the package, the customer’s responsibilities and the assumptions behind an economics claim in plain language. That explanation belongs beside the specification and demonstration evidence. It should be possible for a prospect to share it with operations, finance and the people who will support the system.

I would build a short cost-scope document around one defined application, with a dated configuration, included and excluded items, the operating assumptions and unresolved questions. It does not need to pretend that every buyer has the same costs. It needs to make the next discussion more specific.

That is where positioning becomes commercially useful. A claim such as “affordable autonomy” is easy to print. An explanation of which costs are known, where the capability fits and what the customer still needs to plan is much harder to replace.

Questions worth asking

A few practical answers.

What should a marine drone business case include?

Define the job, the required configuration, deployment conditions, people, integration, recurring support and the evidence for expected use. Separate a supplier quote from an internal estimate and an assumption. Compare alternatives over the same period and scope.

Can a lower unit price justify buying more vehicles?

It can make additional capacity affordable, but the fleet still needs support. Check whether people, launch and recovery, charging, spare parts, data handling and maintenance can support the extra vehicles. Extra units do not automatically produce extra useful work.

How do I calculate cost per deployment?

Divide the costs within a clearly defined period by the number of deployments in that period. For a planning estimate, identify the deployment count as a forecast. The worksheet here uses planned deployments and excludes any costs you have not entered.

Should a prototype business case include future production savings?

Show them separately as scenarios with explicit assumptions. A projected production cost is different from a current supplier quote, and neither is the customer’s complete cost of using a system. Identify what evidence would make the projection more credible.

If the economics are promising, make them understandable.

I help technical companies turn complex capability into a business story that a serious buyer can examine. If your marine product needs a clearer cost explanation, tell me what is being sold and what the buyer is struggling to evaluate. Start with public, non-confidential information.

For the wider commercial setting, see my work with marine and maritime manufacturing companies.

Scroll to Top